Henan Yinchen Boiler Group Co.,Ltd

Henan Yinchen Boiler Group Co.,Ltd

Manufacturer from China
Active Member
7 Years
Home / Products / Horizontal Steam Boiler /

Industrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine Industry

Contact Now
Henan Yinchen Boiler Group Co.,Ltd
City:zhoukou
Province/State:henan
Country/Region:china
Contact Now

Industrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine Industry

Ask Latest Price
Video Channel
Brand Name :Yinchen
Model Number :DZL-DZH
Certification :ISO SGS CE GB
Place of Origin :China
MOQ :1
Price :usd 5000-98000 set
Payment Terms :L/C, T/T, MoneyGram
Supply Ability :5000 set per year
Delivery Time :1-20 working days
Packaging Details :1.Package: Regular package or naked package; 2.Transportation: By land or by sea , it depends on the exporting areas.
Product Name :Fixed Grate/Chain Grate/Moving Grate Coal Biomass Wood Fired Steam Boiler
Rated steam capacity :1t/h--20t/h
Rated Pressure :1.25 Mpa
Rated steam temperature :194 ℃
Design fuel :Coal,Biomass etc
Colour :Customized
Grate type 1 :Chain grate
Grate type 2 :Moving grate
Grate type 3 :Fixed grate
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Yinchen Boiler Factory Industrial Fixed Grate/Chain Grate/Moving Grate Coal Biomass Wood Fired Steam Boiler

Product information

1. Model:DZL and DZH
2. Capacity:1-20ton/h
3. Design pressure:1.0Mpa(10bar), 1.25Mpa(13bar), 1.6Mpa(16bar),2.5Mpa(25bar)
4. Stem temperature:184C,194C,204C,224C
5. Design fuel:coal,biomass,wood,rice husk,coconut shell,Palm shell etc
6. Structure: three pass structure with water and fire tube
7. Application: textile plant, milk pasteurization,corrugated machine, sugar factory,printing dyeing mill,medicine industry, food & beverage industry, chemical industry, garment industry, food processing industry, and wood processing industry, etc.

Product characteristics

♦Spirally corrugated tube

Function: (1) Heat transfer enhancement; (2) Improve the suppleness to avoid the tube plate cracking; (3) Clean groove itself.

♦Arched tube plate

reduce the thermal stress of weld; improve the tube plate suppleness; simplify the structure and save the boiler room space.

♦Complete protection device

Function: deal with the situation of over pressure, over-temperature, water shortage and flame out.

♦Up-tube layout

Function: (1) Avoid the bulging on boiler drum; (2) Promote the water cycle (3)clean the sediment in the boiler bottom.

♦Airfoil flue

Function: Lower the high temperature of tube plate flue gas. And then reduce the thermal load of the boiler bottom.

♦The return water injector

Function: Increase the reliability of the water circulation and avoid the booster caused by the poor circulation.

Product technicals

DZL Boiler parameters:

Type Rated Capacity Rated Steam Pressure Feed Water Temperature Steam Temperature

Grate

Area

Exhaust

gas temperature

Thermal

Efficiency

Maximum size
DZL1-1.0-AII 1 1 20 184 1.9 157.3 80.33 5488×2000×2832
DZL2-1.6- AII 2 1.6 20 205 3.4 163.1 80.54 5694×2550×3364
DZL4-1.6- AII 4 1.6 20 205 5.18 169 80.28 6470×2820×3668
DZL6-1.6- AII 6 1.6 20 205 7.55 166.3 80.94 8244×2951×3550
DZL10-1.6- AII 10 1.6 105 205 12 151.2 80.91 7700×3200×3500
DZL15-1.6- AII 15 1.6 105 205 18 161.6 81.5 7650×3350×3500
DZL20-1.6- AII 20 1.6 105 206 22.85 150.6 81.44 7665×3800×3565

DZH Boiler parameters:

Type Rated Evaporation Rated Steam Pressure Steam Heating Area Grate Area Size
(t/h) (Mpa) Temperature (㎡) (㎡) L×W×H
(℃) (m)
DZH1-0.7- AII 1 0.7 170 36.5 1.9 3.9×1.85×3.12
DZH1-1.0- AII 1 1 184 39.4 1.9 3.9×1.85×3.12
DZH2-0.7- AII 2 0.7 171 53.6 3.74 4.5×2.24×3.32
DZH2-1.25- AII 2 1.25 194 73.6 3.74 4.5×2.24×3.32
DZH4-1.25- AII 4 1.25 194 146.03 3.93 5.3×2.44×3.6

Why do you choose us?

(1) Strength calculation report with applied materials information;

(2) 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;

(3) 100% X-ray inspection(welding seam): ensure the quality of entire boiler;

(4) Hydrostatic test ensure the standard working pressure and safety;

(5) Third-party inspection report:By Henan Boiler Inspection Institute;

(6) Passed ISO:9001 SGS and CE certificate.

Packing and shipping

1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up.


2.the smaller auxiliary equipments are encased by using the strong intensity wooden or plywood box.


3.The products could be transported by ship and train, customers could designate the ports.


4.If necessary, the small auxiliaries could be transported by air.

Our warranty

We promise every set of machine with the top quality and best after-sales service as followings :

(A) The boiler body guarantee is one years, for accessories three years

(B) During the guarantee period , if the main body defective or broken without wrong operating , we must replace the parts for free or prepare the spare-parts for free.

(C) We should provide boiler technical service and operation guidance for whole life long.

(D) Regarding to the installation and training , the buyer should take all the correlative charges (accommodation and food , round -trip tickets)

Industrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine IndustryIndustrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine Industry

Industrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine IndustryIndustrial Fixed Grate Wood Chip Steam Boiler Three Pass For Medicine Industry

Inquiry Cart 0