Henan Yinchen Boiler Group Co.,Ltd

Henan Yinchen Boiler Group Co.,Ltd

Manufacturer from China
Active Member
7 Years
Home / Products / Industrial Steam Boilers /

Yinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed Mill

Contact Now
Henan Yinchen Boiler Group Co.,Ltd
City:zhoukou
Province/State:henan
Country/Region:china
Contact Now

Yinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed Mill

Ask Latest Price
Video Channel
Brand Name :Yinchen
Model Number :WNS
Certification :ISO SGS CE GB
Place of Origin :China
MOQ :1
Price :6000-69800 USD
Payment Terms :L/C, T/T, MoneyGram
Supply Ability :5000 set month
Delivery Time :1-20 working days
Packaging Details :1.Package: Boiler body covered with water-proof covering, accessories in plywood case or iron box.
Name :Industrial Steam Boiler For Feed Mill
Material :Q245R steel plate
Boiler warranty :12 years
Boiler control :automatic
Thermal efficiency :>94%
Type :Natural circulation
After-sales service :Engineer available to overseas service
Stype :Horizontal
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Yinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed Mill

The boiler belongs to the furnace-down type internal combustion three-return wet-back type shell quick-loading boiler.

With the following feature:

1. Unique structure design of big combustion chamber, 3-stroke all wet-back structure, super radiation heat-exchange and low temperature burning to improve thermal efficiency, reduce NOX emission and protect the environment.
2. Adoption of thread smoke tube improves heat transmission and thermal efficiency.
3. Multiple-sealing of boiler front and back smoke box prevent smoke leakage.
4. Large steam space leads to better steam quality.
5. Multiple measures of such as water level,steam pressure and smoke-discharging temperature make the boiler safe and reliable.
6.Efficient thermal protection materials ensurethe lower boiler surface temperature.
7.Boiler energy-saver of GENTLE company save the fuel cost by 5-15%, Upgrading the boiler into condenser ones.
8.Multiple-point pollutant discharging makes the heating surface of boiler cleaner.

Technical :



Boiler Model

Rated CapacityRated PressureSteam Temperature


Fuel consumption

Thermal efficiencyWeight
t/hMpa

Diesel oil
(Kg/h)

Natural gas
(Nm³/h)

%T
WNS0.5-1.0-Y(Q)0.5118420-3518-35>903
WNS1-1.0-Y(Q)1118445-10070-100>90.24.3
WNS2-1.25-Y(Q)21.25194120-140140-150>91.57.2
WNS3-1.25-Y(Q)31.25194180-210185-230>91.68
WNS4-1.25-Y(Q)41.25194230-280240-290>91.79.6
WNS6-1.25-Y(Q)61.25194360-380370-400>9216.5
WNS8-1.25-Y(Q)81.25194470-510480-530>91.324.8
WNS10-1.25-Y(Q)101.25194600-630650-700>92.426.8
WNS15-1.25-Y(Q)151.25194900-940930-1000>92.538
WNS20-1.25-Y(Q)201.251941200-13001350-1500>9355


Service:

Pre-sale service: Provide relative technical data,foundation drawing,layout drawing,boiler room drawing and general drawing.

After-sale service:Help customer installation and commissioning. Free maintenance and repair for one year.

FAQ

Q1: How do you get the price?
First,You can tell us the boiler capacity, the fuel or pressure. Or tell us your configuration requirement.
Q2: Why do you choose us?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4).Hydrostatic test ensure the standard working pressure and safety;
(5).Third-party inspection report:By Henan Boiler Inspection Institute;
(6).Passed ISO:9001 and SGS certificate.

Q3: What about the installation and Commissioning?
After you receive the boiler, we will guide you to make some preparation for installation;If necessary, our expert will fly to your place in 72 hours. The experts will responsible for guiding installation and commissioning.

Q4:What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,you can use 20-25 years.

Packing and transportation:

1.When transport, the boiler body and large auxiliary equipments (platform, chimney, economizer, etc ) are nude packed or tied up.
2.the smaller auxiliary equipments are encased by using the strong intensity wooden or plywood box.
3.The products could be transported by ship and train, customers could designate the ports.
4.If necessary, the small auxiliaries could be transported by airplane.

Yinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed MillYinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed MillYinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed MillYinchen Brand Boiler Manufacture Industrial Steam Boiler For Feed Mill








































Inquiry Cart 0